Anderson Stuart North Entry

 
CLIENT
DVC, Infrastructure
LOCATION
Eastern Avenue, Camperdown
DESCRIPTION

This project includes conservation work to the northern façade (1909 – 22) and new entrance terrace to improve access.

The conservation works are the replacement of the existing slate roof with new slate sourced from Canada. The cleaning, raking out and repointing of existing stonework joints. The replacement of a number of parapet and gargoyle stones. The treatment of effected stone with poultice to remove salt from effected areas. The cleaning, repair and painting of existing windows.

The replacement stone is being supplied out of the NSW Government’s sandstone reserve for state listed heritage buildings for which the original quarries are no longer in existence. The NSW Department of Commerce.

The project commenced construction in January 2006, and is due for completion in September.

PHOTOS

Recovered stones.
Fleche.
Roof slate installation.
Joints condition.
Repaired stonework.

PROJECT MANAGER Fred Moise
CONSULTANT TEAM Architect: Clive Lucas Stapleton and Partners
Structural Engineer: Hughes Trueman
Quantity Surveyor: Davis Langdon
BUILDERS Main Contractor: Kane Constructions (NSW)
Stonework: Jasper Swan
Slate Roofing and copper metalwork: Combined Roofing
Leadwork: Architectural Leadwork
Steel and leadlight windows: Heritage Decorative Glass
Sandstone supply: NSW Department of Commerce Centenary Stone program.

Recovered stones to be replaced. Stacked on the ground 11 April.Back to Photos.

Fleche, ready for dismantling prior to reconstruction.Back to Photos.

Roof slate installation underway.Back to Photos.

Existing stonework showing condition of joints.Back to Photos.

Repaired stonework showing new re-pointing.Back to Photos.